Frequently Asked Questions (FAQs)
How are HOA dues determined?
HOA dues for the primary Ellerslie at Delong HOA cover a calendar year and are approved by the HOA Board before the start of the new year. The dues amount for the new year is based on the annual budget for Operating and Administrative expenses and Reserves for future expenses. Some years an increase in dues is warranted and some years no increase is needed. Dues are billed in December of each year with a due date of January 31st of the new year.
Why do I have two invoice(s) or amounts for HOA dues?
Every residence in Ellerslie pays dues to the primary Ellerslie HOA. These dues are billed by AllPoints in December each year. In addition, certain areas of Ellerslie also have additional HOA dues that they are billed for.
The Estates section is billed for costs related to their streets (fire hydrants, snow removal, road repairs). This billing is included on the invoice you get from AllPoints with the main HOA dues.
The two townhouse sections have additional unique HOAs that cover landscaping, roofing, and other costs as defined by their legal documents. The dues for the townhouse HOA's are billed separately and mailed out in December by the respective townhome HOA or property management firm.
The Branham-Weston Estates Section HOA covers the back of the neighborhood as it is still being built-out. These dues cover fire hydrants, snow removal, and administrative expenses and is billed by Commonwealth Designs in December.
When is snow cleared from Ellerslie streets?
In general, Ellerslie streets will be plowed when snow accumulation is 4" or more. This is similar to the Lexington snow plan for city streets. However, in Ellerslie, only Ellerslie Park Blvd and parts of Tatton and Sommersly Place are city streets, and they are Rank 4 or 5 which are plowed later in the day by priority level. Therefore, the additional HOAs in Ellerslie hire private contractor snow plowing and deicing with the intent of having all streets plowed by early morning. Residents are responsible for clearing snow from the sidewalks in front of their homes.
See the Snow Removal Information page on the main menu for details and a map.
Why is the fountain not running this summer (2026)?
The fountain is usually scheduled to start in May and be shut down around November. The start-up process involves cleaning the basin, checking the seal, re-attaching the pump, and getting the water flowing. The fall shut down process is to winterize the water lines and remove the pump for storage. In good years, this is a fairly simple routine. But after a hard winter, the basin was leaking water and could not support a water level deep enough to pump water up to the goose.
Masonry work was done to repair cracks in the basin. Then a new lining was applied that should last several years. There is also a new company hired to update some equipment and provide on-going maintenance. This was completed in September, but then there was an electrical problem, in which we lost electricity to the fountain and the guard house. This is being addressed currently with the hope that the fountain in working again before winter shut down.
Why am I getting a letter from AllPoints about my garbage cans (or a yard sign, or a dead tree, or ...)?
Ellerslie's property management company completes a neighborhood drive-through every two weeks to ensure that all residents are following the use restrictions listed in the CCRs (Covenants, Conditions and Restrictions). The CCRs were signed by homeowners when they purchased their home. Although there are times when the CCR restrictions may seem overly strict, they are put in place to help maintain safety, protect property values, reduce noise, and preserve the overall character and quality of our community. They are enforced to create a comfortable, consistent environment for everyone living in Ellerslie.
If you receive a letter, please realize that this is simply the easiest way to communicate with you about an issue. A first letter is usually labeled as a "courtesy notice" and that is truly the intent ... to inform you of something of which you might not have been aware. Follow-up letters are only sent if the issue is not addressed.
You can contact AllPoints about the issue in the letter if you have questions or comments. If you simply correct the issue noted, that will be the end of the matter.
How can I get my mailbox repaired or brass numbers added?
For mailbox repair help (replace, straighten, add brass numbers) a local handyman can assist you with these items, including ordering a new mailbox or numbers, and/or resetting the post in concrete. See the website's page for Mailbox Repair to obtain details.
Who repairs my sidewalk if it is uneven or damaged?
In Lexington-Fayette Urban County Government (LFUCG), property owners are legally responsible for repairing and maintaining the sidewalks abutting their property at their own expense. Per Lexington Code of Ordinances 17-147, property owners must fix holes, uneven surfaces, and other defects on the sidewalks in front of/beside their houses.
There are several concrete services in Lexington that will repair sidewalks. You can also get information at LexCall 311 (just dial 311).
My street tree is dead; how do I get it replaced?
Street trees are those located between the sidewalk and the street. The neighborhood developer is responsible for the initial placement of street trees in front of new homes. However, if the original street tree dies, then the property owner is responsible for the cost of removing the dead tree and for a replacement.
The Lexington-Fayette Urban County Government (LFUCG) has steps to follow to properly replace street trees. There are approved species of trees to be used. You can get more information on street tree replacement at lexingtonky.gov or contact Urban Forestry at 859-258-3404.
I want to put in a backyard fence (or pool, patio, etc.). What approval do I need?
We use an Architectural Request Committee (ARC) to review and approve changes to your yard and house exterior. Complete an ARC Request in the AllPoints Homeowner's website (portal.allpointscm.com).
After you sign in to the website, choose Requests from the left-hand menu and click the + New Request button. Click ARC Request and follow the directions. Please provide attachments for drawings, pictures, and other details that will assist in approving your request.
Can I get an easement to fence in greenspace in my back yard?
In most cases, yes. Commonwealth Design (the Ellerslie developer) has allowed most homeowners to request additional backyard space when they are adding a fence that borders a green space area. This is done by requesting an easement of 15’ to 20’ beyond their property line. There are a few lots in Ellerslie that are not eligible for the easement due to the shape of the space behind their property, but most lots are eligible for the easement.
There are two steps to getting this approval:
1. Your backyard fence must be approved by submitting an ARC request for a fence (see the previous FAQ). Your ARC request should note that you are seeking an easement for additional fenced in space.
2. The Homeowner should send an email to Commonwealth Designs to request the easement. Please provide:
- Your name, address in Ellerslie, and contact information.
- How far from your property line you are requesting an easement into the greenspace.
- Confirm with Commonwealth Designs know you have also submitted your ACC fence request to AllPoints and the HOA Board.
- Send your request to Commonwealth Design at: johnb@cwdky.com
When can Christmas lights be put up? Taken down? Other holiday decorations?
Outdoor Christmas lights can be on between November 15th and January 15th. However, to accommodate early set-up, Christmas house lights may be installed (but not illuminated) prior to November 15th. They should be taken down by January 15th or as soon as weather permits.
Outdoor Christmas decorations must not be set up before November 15th and must be taken down by January 15th.
Other seasonal decorations (e.g., Halloween, Easter, Independence Day, etc.) must be taken down within seven (7) days following the holiday.
See your CCRs, Article XI, Section 13 "Lighting and Seasonal Decorations" for details.
END
© Copyright 2026 Ellerslie at Delong HOA | Homeowner Association Website by HOA Sites | Terms of Use | Admin
